DeVry University Site Restoration Rendering

• The building was fully demolished in the fall of 2013
• The site was rough graded and seeded before winter
• Full restoration of the site is scheduled between Aug-Oct 2014 and will include:
o Re-grading and reseeding where needed
o Additional landscaping and illuminated pedestrian walk-ways
o A new campus monument sign at the corner of Campbell and Melrose